The project management plan’s what we are likely to prepare in this course, i will mention every one of the descriptions in details within the specified lessons, This lesson is usually to feel the description in the project management software decide to really know what we can prepare in your course and also to provide you with better idea for the purpose you will learn within the next lessons.
The description on this lesson :
1- Narrative post.
2- Video lecture.
3- Quiz to find out your understanding in the lesson. (automatic email will probably be deliver to your Email with all your answers and correct answers for the record.)
Hint: You will observe the playback quality first or look into the narrative post first it does not matter, but you should study both.
The descriptions of the project management software plan for any construction project:
since this system is perfect for schedulers, Therefore i most certainly will talk about the necessary documents from Planners, However the project management software plan could contain other documents made by others rather than related to scheduler including QA/QC policy and safety regulations etc, These kind of documents let me not mention to target around the document you might create to be a Planner.
1- Project Time Schedule:
What is the time schedule?
Time schedule can be a contractual document between your client plus the contractor which defines the forecast sequence, progress with the work along with the contractual start, finish and milestones dates
2- Project Earnings and Manpower Histogram :
A: Cashflow
After finalizing enough time frame we are capable to populate the schedule while using budget cost for each activity by making use of a questionaire called cost loading.To get ready the purchase price loading we create activity list in WBS order with quantities distribution and budget cost.
B: Manpower Histogram
to create Manpower histogram we should create an excel sheet like the cost loading but we calculate the manpower instead of the budget cost (Resource Loading) as per below example
3- Shop Drawings Tracking Log:
The aim of a store Drawings Tracking Log would be to keep monitoring the progress with the shop drawings submittals and approvals to guarantee which the work progress are not stopped or delayed because of shop drawings availability, Normally the consultant or the client won’t let the contractor to start any action without approved shop drawings .Shop Drawings tracking log must be coordinated using the technical department to supply the look engineer which has a set of the forecast shop drawings for all those trades, the planning engineer should drive this process by supplying the technical department while using the proper form to fill the store drawing list so planner fill the planned dates through the schedule and present the form on the document controller to keep updating it.
4- Materials Procurement Tracking Log:
The aim of creating the materials tracking log to monitor the project materials submittals, consultant / client approval, Purchasing the materials, manufacture / procurement with the materials, shipping of the materials and materials delivery for the site. Failure to deliver the type of material on required time will result in project delays. The Materials Tracking Log needs to be coordinated using the procurement department to offer the look engineer having a set of materials in addition to forecast delivery durations for all those trades, the look engineer should drive this by supplying the procurement department while using the proper form to fill it after which planner fill the planned dates from the schedule and present the design for the document controller to keep updating it.
5- Weekly / Monthly Reports:
Mainly the weekly / monthly report is surely an update in the previously listed documents in addition to summary sheets, photos depending on consultant / client requirements.Look at now the Planning Engineer bolg, and start mastering now. It is all totally free of charge and connect all the Planning Engineer from all over the earth. Do not ignore to examine the preparing course for planning engineers as well at http://www.planningengineer.net/ This article is copyright protected.